The KARL Group, a long time customer of Wacker Neuson, relies on the zero emission products in the rehabilitation of the Olympic swimming hall in Munich.

While the first of two areas is being reconstructed, the other parts of the building will remain open at the same time as the renovation work, which is a major challenge for all those involved. Therefore, it needs machines that work with less noise and emission free.

Tamara Zettl, Bauleiterin bei KARL-Bau

„We were very surprised: The electric wheel loader WL20e has as much power as a different powered device and was running seven hours non-stop. At night, when no work was done, we could easily charge the battery.“
 